Renovation bringing two times the space, increased safety for staff, technologically advanced imaging equipment, and the ability to provide much more complex procedures. The upgraded facility accommodates 10 patient beds and supports more complex medical procedures. The project, delivered in three phases, involved hoarding, abatement, demolition, flooring, drywall, painting, and mechanical and electrical work, including the installation of medical equipment as per specifications (two Siemens CT Scans).
The phased construction approach allowed the hospital to remain fully operational with minimal disruption to patients receiving treatment. Stringent Infection Prevention and Control protocols were followed throughout to ensure a safe environment for both patients and healthcare workers.