PICKERING GO PEDESTRIAN BRIDGE PHASE 1

PICKERING GO PEDESTRIAN BRIDGE PHASE 1

Dineen was originally contracted to add elevators that serviced the pedestrian bridge
and the train platforms. One elevator for the eastbound platform and one elevator for the westbound
platform. Extensive shoring was required to establish the foundations such that there would be no
influence to the active train rails about 9’ away. Self-supporting structural steel towers were erected
with cantilevered walkways from the towers to the pedestrian bridge. The steel towers were clad with
glazing and composite panels. The elevators were installed within each of the structural towers. The
value of this project was approximately $4,6 million.