Milton Sports Centre holds two ice rinks and a gymnasium for the local gymnastics club, a community room and City offices. The mechanical, electrical and refrigeration contractors were closely supervised and coordinated to ensure the proper installation.
This 7-storey precast and poured concrete structure was designed to resemble an upscale office building. The total area comprises 130,000 SF and contains 10,000 SF of office space on two levels with street/garage access and an internal elevator.
Phase 3 of construction work for Stephen Leacock Community Recreation Centre was funded in part by the federal Infrastructure Stimulus Fund.