Location: Oshawa, Ontario
Completion Date: August 2019
Dineen completed the renovation to the Cancer Floor including new Clean Room, HVAC, electrical fixtures, flooring and ceiling. Work included demolition, concrete work, metal fabrication, rough carpentry, woodwork, wall/ceiling panels, fire stopping/sealants, doors/frames/hardware, glass/glazing, drywall, flooring, wall panel systems, painting, fire protection, plumbing, equipment, furnishings.
The team ensured the Cancer Centre was operational while building the new facilities. The project was completed in 7 phases – each phase with 6 mini phases to not interrupt the existing operation of the Cancer Centre. Phasing and IPAC followed, as required.